Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0122 # 01 Y:2006 | 01 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,489 | $58,358 | Implemented |
IC0122 # 02 Y:2006 | 02 | 2006 | REPLACE BOILER | $10,973 | $46,865 | Not Implemented |
IC0122 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,130 | $21,000 | Not Implemented |
IC0122 # 04 Y:2006 | 04 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $2,700 | $0 | Implemented |
IC0122 # 05 Y:2006 | 05 | 2006 | INSTALL OCCUPANCY SENSORS | $1,480 | $1,791 | Implemented |
IC0122 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $0 | Implemented |
IC0122 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $268 | $816 | Not Implemented |
SD0389 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $231,300 | $1,500,000 | Not Implemented |
SD0389 # 02 Y:2006 | 02 | 2006 | USE PHOTOCELL CONTROLS | $846 | $480 | Implemented |
SD0389 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $433 | $2,797 | Implemented |
SD0389 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $601 | $4,125 | Not Implemented |
SD0389 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $264 | $1,006 | Implemented |
NC0351 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,660 | $9,688 | Not Implemented |
NC0351 # 02 Y:2006 | 02 | 2006 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,147 | $2,800 | Not Implemented |
NC0351 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,475 | $4,243 | Not Implemented |
NC0351 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $885 | $1,000 | Not Implemented |
NC0351 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $484 | $100 | Implemented |
NC0351 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,135 | $1,000 | Implemented |
NC0351 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $58 | $39 | Implemented |
NC0350 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $122,745 | $114,000 | Not Implemented |
NC0350 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,138 | $10,500 | Not Implemented |
NC0350 # 03 Y:2006 | 03 | 2006 | USE OPTIMUM THICKNESS INSULATION | $12,275 | $1,000 | Implemented |
NC0350 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,381 | $2,000 | Not Implemented |
NC0350 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $100 | Implemented |
AS0431 # 01 Y:2006 | 01 | 2006 | USE SOLAR HEAT TO HEAT WATER | $1,728 | $8,800 | n/a |