IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0626 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $250 $15 Implemented
AM0626 # 07 Y:2012 07 2012 INSTALL SKYLIGHTS $3,330 $10,400 Not Implemented
AM0626 # 08 Y:2012 08 2012 INSTALL SKYLIGHTS $1,300 $3,170 Not Implemented
AM0626 # 09 Y:2012 09 2012 INSTALL SKYLIGHTS $520 $1,410 Not Implemented
BD0419 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,031 $31,529 Implemented
BD0419 # 02 Y:2012 02 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $10,810 $14,000 Not Implemented
BD0419 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,421 $7,300 Implemented
BD0419 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $929 $1,200 Implemented
BD0419 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $849 $500 Not Implemented
BD0419 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $820 $20 Not Implemented
BD0419 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $648 $220 Not Implemented
BD0419 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $642 $600 Not Implemented
BD0419 # 09 Y:2012 09 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $421 $700 Implemented
IA0491 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,631 $600 Implemented
IA0491 # 02 Y:2012 02 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,278 $530 Not Implemented
IA0491 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,619 $10,841 Implemented
IA0491 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,510 $18,286 Implemented
IA0491 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,096 $2,626 Implemented
IA0491 # 06 Y:2012 06 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $363 $175 Implemented
UMS012 # 01 Y:2012 01 2012 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $347,000 $600,000 Not Implemented
UMS012 # 02 Y:2012 02 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $553,000 $750,000 Not Implemented
MI0233 # 01 Y:2012 01 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $246,388 $33,021 Implemented
MI0233 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $150,126 $80 Implemented
MI0233 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $44,157 $11,632 Not Implemented
MI0233 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,400 $1,660 Implemented