IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0567 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $5,896 $6,014 Implemented
WV0567 # 06 Y:2018 06 2018 RECYCLE WHITE WATER $4,061 $450 Implemented
WV0567 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $1,487 $1,690 Implemented
WV0567 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $495 $500 Implemented
WV0567 # 09 Y:2018 09 2018 DEVELOP A REPAIR/REPLACE POLICY $408 $563 Implemented
NC0623 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,801 $500 Implemented
NC0623 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $900 Implemented
NC0623 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $2,320 $1,203 Implemented
NC0623 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,478 $16,800 Implemented
NC0623 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,884 $10,000 Not Implemented
NC0623 # 06 Y:2018 06 2018 AVOID REWINDING MOTORS MORE THAN TWICE $38,566 $70,014 Not Implemented
LS1817 # 01 Y:2018 01 2018 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,865 $315 Not Implemented
LS1817 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $794 $75 Not Implemented
LS1817 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,054 $16,147 Not Implemented
LS1817 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $86 $78 Not Implemented
LS1816 # 01 Y:2018 01 2018 INSTALL OCCUPANCY SENSORS $377 $68 Implemented
LS1816 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,290 $265 Not Implemented
LS1816 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,129 $25,545 Not Implemented
LS1816 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,029 $66,000 Not Implemented
LS1816 # 05 Y:2018 05 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $7,510 $13,000 Not Implemented
LS1816 # 06 Y:2018 06 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $232,778 $428,000 Not Implemented
SU0472 # 01 Y:2018 01 2018 PAY BILLS ON TIME TO AVOID LATE FEES $4,715 $0 Implemented
SU0472 # 02 Y:2018 02 2018 INSULATE FEEDWATER TANK $1,339 $6,120 Implemented
SU0472 # 03 Y:2018 03 2018 USE PHOTOCELL CONTROLS $482 $265 Not Implemented
SU0472 # 04 Y:2018 04 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $10,224 $10,000 Not Implemented