IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0294 # 10 Y:2002 10 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,212 $1,500 Implemented
IA0294 # 11 Y:2002 11 2002 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,752 $500 Implemented
IA0294 # 12 Y:2002 12 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $843 $326 Implemented
LL0149 # 01 Y:2002 01 2002 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $1,932 $1,499 Implemented
LL0149 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,591 $210 Not Implemented
LL0149 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,237 $0 Not Implemented
LL0149 # 04 Y:2002 04 2002 INSTALL SKYLIGHTS $1,206 $1,660 Implemented
LL0149 # 05 Y:2002 05 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,505 $2,255 Implemented
LM0042 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $646 $193 Implemented
LM0042 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,591 $438 Implemented
LM0042 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $899 $169 Not Implemented
LM0042 # 04 Y:2002 04 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $713 $806 Implemented
LM0042 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,270 $45,600 Not Implemented
LM0042 # 06 Y:2002 06 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $44,755 $30,000 Not Implemented
WV0244 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,136 $108 Implemented
WV0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,433 $900 Implemented
WV0244 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,318 $193 Implemented
WV0244 # 04 Y:2002 04 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $3,380 $4,950 Not Implemented
WV0244 # 05 Y:2002 05 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,244 $19,144 Not Implemented
WV0244 # 06 Y:2002 06 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,994 $10,000 Not Implemented
WV0244 # 07 Y:2002 07 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,266 $4,270 Implemented
WV0244 # 08 Y:2002 08 2002 METER WASTE WATER $29,520 $944 Implemented
WV0244 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,076 $4,000 Not Implemented
WV0244 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,200 $11,000 Not Implemented
NC0241 # 01 Y:2002 01 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,456 $8,000 Implemented