Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0715 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,665 | $47,100 | Not Implemented |
OK0715 # 06 Y:2005 | 06 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,022 | $608 | Not Implemented |
OK0715 # 07 Y:2005 | 07 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $472 | $1,000 | Not Implemented |
OK0715 # 08 Y:2005 | 08 | 2005 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,361 | $26,590 | Not Implemented |
OK0715 # 09 Y:2005 | 09 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $20,968 | $0 | Not Implemented |
OK0714 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $1,866 | $0 | Not Implemented |
OK0714 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $56,721 | $117,780 | Implemented |
OK0714 # 03 Y:2005 | 03 | 2005 | USE COMPRESSOR AIR FILTERS | $4,058 | $920 | Implemented |
OK0714 # 04 Y:2005 | 04 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,299 | $70 | Implemented |
OK0714 # 05 Y:2005 | 05 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $10,600 | $0 | Implemented |
OK0714 # 06 Y:2005 | 06 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $70,215 | $3,931 | Not Implemented |
OK0713 # 01 Y:2005 | 01 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $81,171 | $1,436 | Implemented |
OK0713 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,495 | $85,051 | Implemented |
OK0713 # 03 Y:2005 | 03 | 2005 | USE COMPRESSOR AIR FILTERS | $5,346 | $35 | Implemented |
OK0713 # 04 Y:2005 | 04 | 2005 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $48,000 | $35 | Implemented |
OK0713 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,796 | $139,341 | Not Implemented |
OK0713 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,489 | $3,283 | Not Implemented |
OK0713 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $561 | $975 | Not Implemented |
OK0712 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,981 | $11,356 | Not Implemented |
OK0712 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,669 | $7,920 | Not Implemented |
OK0712 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,357 | $23,560 | Not Implemented |
OK0712 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $672 | $1,820 | Not Implemented |
OK0712 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,800 | $5,000 | Not Implemented |
OK0712 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $39,487 | $48,800 | Not Implemented |
OK0712 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,142 | $860 | Not Implemented |