Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0241 # 02 Y:2002 | 02 | 2002 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,506 | $6,000 | Not Implemented |
NC0241 # 03 Y:2002 | 03 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $4,751 | $6,493 | Implemented |
NC0241 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $503 | $576 | Not Implemented |
NC0241 # 05 Y:2002 | 05 | 2002 | KEEP BOILER TUBES CLEAN | $499 | $1,600 | Implemented |
NC0237 # 01 Y:2002 | 01 | 2002 | RECYCLE WHITE WATER | $6,970 | $3,500 | Implemented |
NC0237 # 02 Y:2002 | 02 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,443 | $680 | Implemented |
NC0237 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,935 | $3,000 | Not Implemented |
NC0237 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,825 | $500 | Not Implemented |
SU0138 # 01 Y:2002 | 01 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,127 | $1,445 | Not Implemented |
SU0138 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $939 | $0 | Implemented |
SU0138 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,706 | $0 | Not Implemented |
SU0138 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,391 | $0 | Implemented |
SU0138 # 05 Y:2002 | 05 | 2002 | ELIMINATE SHIFT | $10,752 | $0 | Implemented |
SU0138 # 06 Y:2002 | 06 | 2002 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $88,027 | $55,497 | Not Implemented |
SU0137 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $111 | $0 | Implemented |
SU0137 # 02 Y:2002 | 02 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $429 | $71 | Implemented |
SU0137 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $806 | $2,150 | Not Implemented |
SU0137 # 04 Y:2002 | 04 | 2002 | OPTIMIZE PLANT POWER FACTOR | $923 | $3,750 | Not Implemented |
SU0137 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,228 | $327 | Implemented |
SU0137 # 06 Y:2002 | 06 | 2002 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,312 | $327 | Not Implemented |
SU0137 # 07 Y:2002 | 07 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,451 | $0 | Implemented |
SU0137 # 08 Y:2002 | 08 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,580 | $510 | Implemented |
UD0650 # 01 Y:2002 | 01 | 2002 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $99,990 | $64,500 | Not Implemented |
UD0650 # 02 Y:2002 | 02 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $37,195 | $95,000 | Not Implemented |
UD0650 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,914 | $12,000 | Not Implemented |