IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0290 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $10,346 $2,533 Implemented
SU0194 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Implemented
SU0194 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $734 $11 Implemented
SU0194 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $1,616 Implemented
SU0194 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,404 $868 Implemented
SU0194 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,484 $576 Implemented
SU0194 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $154 Implemented
SU0194 # 07 Y:2004 07 2004 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,122 $2,975 Not Implemented
SD0348 # 01 Y:2004 01 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,921 $12,655 Not Implemented
SD0348 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,682 $2,600 Not Implemented
SD0348 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,371 $747 Not Implemented
SD0348 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $1,538 $1,720 Not Implemented
SD0348 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,553 $18,500 Not Implemented
SD0348 # 06 Y:2004 06 2004 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $70,166 $43,083 Not Implemented
SD0348 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $2,935 $3,500 Not Implemented
WV0292 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $27,182 $23,577 Implemented
WV0292 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $20,348 $0 Implemented
WV0292 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $19,410 $20,490 Not Implemented
WV0292 # 04 Y:2004 04 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $20,214 $5,139 Not Implemented
WV0292 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $12,831 $800 Implemented
WV0292 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $11,831 $488 Not Implemented
WV0292 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,318 $16,842 Not Implemented
WV0292 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,268 $3,720 Not Implemented
WV0292 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,017 $21,962 Not Implemented
WV0292 # 10 Y:2004 10 2004 REPAIR OR REPLACE STEAM TRAPS $40,944 $1,000 Implemented