IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0650 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $799 $2,372 Not Implemented
UD0650 # 05 Y:2002 05 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $213 $0 Implemented
UD0650 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $15 Not Implemented
UD0650 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $131 $406 Not Implemented
WV0243 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $520 $150 Implemented
WV0243 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $38,997 $220 Implemented
WV0243 # 03 Y:2002 03 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $38,007 $550 Implemented
WV0243 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,642 $2,800 Not Implemented
WV0243 # 05 Y:2002 05 2002 REPAIR AND ELIMINATE STEAM LEAKS $45,099 $1,050 Implemented
WV0243 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $1,799 $1,500 Not Implemented
WV0243 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $2,317 $777 Implemented
WV0243 # 08 Y:2002 08 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $8,000 $9,750 Not Implemented
WV0243 # 09 Y:2002 09 2002 MINIMIZE WATER USAGE $8,228 $10,000 Not Implemented
WV0243 # 10 Y:2002 10 2002 UTILIZE OUTSIDE CONTRACTING $87,058 $1,100 Not Implemented
UF0308 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,465 $10,121 n/a
UF0308 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,612 $500 n/a
UF0308 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,366 $0 n/a
UF0308 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,184 $1,033 n/a
UF0308 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $4,591 $291 n/a
UF0308 # 06 Y:2002 06 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,687 $19,500 n/a
UF0308 # 07 Y:2002 07 2002 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $4,770 $864 n/a
UF0307 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $26,416 $12,233 Implemented
UF0307 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,458 $8,116 Not Implemented
UF0307 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,706 $107,644 Implemented
UF0307 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $36,062 $107,250 Not Implemented