Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0650 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $799 | $2,372 | Not Implemented |
UD0650 # 05 Y:2002 | 05 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $213 | $0 | Implemented |
UD0650 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $133 | $15 | Not Implemented |
UD0650 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $131 | $406 | Not Implemented |
WV0243 # 01 Y:2002 | 01 | 2002 | INSTALL OCCUPANCY SENSORS | $520 | $150 | Implemented |
WV0243 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $38,997 | $220 | Implemented |
WV0243 # 03 Y:2002 | 03 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $38,007 | $550 | Implemented |
WV0243 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,642 | $2,800 | Not Implemented |
WV0243 # 05 Y:2002 | 05 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $45,099 | $1,050 | Implemented |
WV0243 # 06 Y:2002 | 06 | 2002 | USE PHOTOCELL CONTROLS | $1,799 | $1,500 | Not Implemented |
WV0243 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $2,317 | $777 | Implemented |
WV0243 # 08 Y:2002 | 08 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $8,000 | $9,750 | Not Implemented |
WV0243 # 09 Y:2002 | 09 | 2002 | MINIMIZE WATER USAGE | $8,228 | $10,000 | Not Implemented |
WV0243 # 10 Y:2002 | 10 | 2002 | UTILIZE OUTSIDE CONTRACTING | $87,058 | $1,100 | Not Implemented |
UF0308 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,465 | $10,121 | n/a |
UF0308 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,612 | $500 | n/a |
UF0308 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,366 | $0 | n/a |
UF0308 # 04 Y:2002 | 04 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,184 | $1,033 | n/a |
UF0308 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $4,591 | $291 | n/a |
UF0308 # 06 Y:2002 | 06 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,687 | $19,500 | n/a |
UF0308 # 07 Y:2002 | 07 | 2002 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $4,770 | $864 | n/a |
UF0307 # 01 Y:2002 | 01 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $26,416 | $12,233 | Implemented |
UF0307 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,458 | $8,116 | Not Implemented |
UF0307 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,706 | $107,644 | Implemented |
UF0307 # 04 Y:2002 | 04 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $36,062 | $107,250 | Not Implemented |