IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0713 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $81,171 $1,436 Implemented
OK0713 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,495 $85,051 Implemented
OK0713 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,346 $35 Implemented
OK0713 # 04 Y:2005 04 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $48,000 $35 Implemented
OK0713 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,796 $139,341 Not Implemented
OK0713 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,489 $3,283 Not Implemented
OK0713 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $561 $975 Not Implemented
UU0087 # 01 Y:2005 01 2005 EXPAND OPERATIONS INTO UNUSED SPACE $84,030 $200,000 Not Implemented
UU0087 # 02 Y:2005 02 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,270 $0 Not Implemented
UU0087 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,180 $3,040 Not Implemented
UU0087 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,680 $240 Not Implemented
UU0087 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $470 $2,900 Not Implemented
WV0319 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $7,154 $535 Implemented
WV0319 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,038 $1,300 Not Implemented
WV0319 # 03 Y:2005 03 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,621 $4,400 Implemented
WV0319 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,456 $0 Implemented
WV0319 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,354 $1,476 Not Implemented
WV0319 # 06 Y:2005 06 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,156 $5,590 Not Implemented
WV0319 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,615 $1,000 Implemented
WV0319 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,207 $3,570 Implemented
WV0319 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $820 $660 Implemented
WV0319 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $573 $300 Not Implemented
WV0319 # 11 Y:2005 11 2005 DEVELOP A REPAIR/REPLACE POLICY $561 $327 Implemented
SU0219 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,621 $0 Implemented
SU0219 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,400 $0 Not Implemented