Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0713 # 01 Y:2005 | 01 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $81,171 | $1,436 | Implemented |
OK0713 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,495 | $85,051 | Implemented |
OK0713 # 03 Y:2005 | 03 | 2005 | USE COMPRESSOR AIR FILTERS | $5,346 | $35 | Implemented |
OK0713 # 04 Y:2005 | 04 | 2005 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $48,000 | $35 | Implemented |
OK0713 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,796 | $139,341 | Not Implemented |
OK0713 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,489 | $3,283 | Not Implemented |
OK0713 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $561 | $975 | Not Implemented |
UU0087 # 01 Y:2005 | 01 | 2005 | EXPAND OPERATIONS INTO UNUSED SPACE | $84,030 | $200,000 | Not Implemented |
UU0087 # 02 Y:2005 | 02 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,270 | $0 | Not Implemented |
UU0087 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,180 | $3,040 | Not Implemented |
UU0087 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,680 | $240 | Not Implemented |
UU0087 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $470 | $2,900 | Not Implemented |
WV0319 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $7,154 | $535 | Implemented |
WV0319 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,038 | $1,300 | Not Implemented |
WV0319 # 03 Y:2005 | 03 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,621 | $4,400 | Implemented |
WV0319 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,456 | $0 | Implemented |
WV0319 # 05 Y:2005 | 05 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,354 | $1,476 | Not Implemented |
WV0319 # 06 Y:2005 | 06 | 2005 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,156 | $5,590 | Not Implemented |
WV0319 # 07 Y:2005 | 07 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,615 | $1,000 | Implemented |
WV0319 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,207 | $3,570 | Implemented |
WV0319 # 09 Y:2005 | 09 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $820 | $660 | Implemented |
WV0319 # 10 Y:2005 | 10 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $573 | $300 | Not Implemented |
WV0319 # 11 Y:2005 | 11 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $561 | $327 | Implemented |
SU0219 # 01 Y:2005 | 01 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $15,621 | $0 | Implemented |
SU0219 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,400 | $0 | Not Implemented |