Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0077 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $265 | $433 | Not Implemented |
OD0077 # 06 Y:1997 | 06 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $9 | $0 | Not Implemented |
OD0077 # 07 Y:1997 | 07 | 1997 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $86 | $75 | Implemented |
OD0077 # 08 Y:1997 | 08 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $257 | $97 | Not Implemented |
TN0600 # 01 Y:1997 | 01 | 1997 | MODIFY CURRENT INCENTIVE PROGRAM | $105,000 | $10,000 | Not Implemented |
TN0600 # 02 Y:1997 | 02 | 1997 | REDUCE SCRAP PRODUCTION | $62,970 | $9,000 | Implemented |
TN0600 # 03 Y:1997 | 03 | 1997 | ELIMINATE THIRD SHIFT | $20,340 | $4,000 | Implemented |
TN0600 # 04 Y:1997 | 04 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $6,580 | $0 | Not Implemented |
TN0600 # 05 Y:1997 | 05 | 1997 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $9,100 | $3,775 | Not Implemented |
TN0600 # 06 Y:1997 | 06 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $8,925 | $6,000 | Not Implemented |
TN0600 # 07 Y:1997 | 07 | 1997 | INSULATE BARE EQUIPMENT | $3,140 | $410 | Not Implemented |
TN0600 # 08 Y:1997 | 08 | 1997 | OPTIMIZE PLANT POWER FACTOR | $2,500 | $5,675 | Implemented |
TN0600 # 09 Y:1997 | 09 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,360 | $2,590 | Implemented |
TN0600 # 10 Y:1997 | 10 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $985 | $535 | Not Implemented |
OD0076 # 01 Y:1997 | 01 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,337 | $1,495 | Not Implemented |
OD0076 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,063 | $2,738 | Implemented |
OD0076 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $723 | $882 | Implemented |
OD0076 # 04 Y:1997 | 04 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $385 | $210 | Implemented |
OD0076 # 05 Y:1997 | 05 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $996 | $1,452 | Not Implemented |
OD0076 # 06 Y:1997 | 06 | 1997 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,088 | $625 | Not Implemented |
OD0076 # 07 Y:1997 | 07 | 1997 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $6,780 | $1,911 | Not Implemented |
OD0075 # 01 Y:1996 | 01 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,911 | $1,400 | Implemented |
OD0075 # 02 Y:1996 | 02 | 1996 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,096 | $5,800 | Not Implemented |
OD0075 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,546 | $51,404 | Implemented |
OD0075 # 04 Y:1996 | 04 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $4,186 | $5,691 | Implemented |