IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0556 # 07 Y:2010 07 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,397 $11,734 Not Implemented
OR0556 # 08 Y:2010 08 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $16,479 $65,003 Not Implemented
NC0408 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,189 $1,000 Implemented
NC0408 # 02 Y:2010 02 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $5,644 $1,689 Implemented
NC0408 # 03 Y:2010 03 2010 REPAIR OR REPLACE STEAM TRAPS $5,428 $5,500 Implemented
NC0408 # 04 Y:2010 04 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $712,007 $1,750,000 Implemented
NC0408 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $7,665 Implemented
NC0408 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $27,873 $53,873 Implemented
NC0408 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,195 $2,876 Implemented
NC0408 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $882 $924 Implemented
NC0408 # 09 Y:2010 09 2010 OPTIMIZE PLANT POWER FACTOR $11,133 $20,000 Not Implemented
NC0408 # 10 Y:2010 10 2010 DEVELOP A REPAIR/REPLACE POLICY $11,081 $2,538 Implemented
NC0408 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $100 Implemented
SF0386 # 01 Y:2010 01 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,471 $0 Not Implemented
SF0386 # 02 Y:2010 02 2010 USE PHOTOCELL CONTROLS $4,307 $3,738 Not Implemented
SF0386 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $1,600 Not Implemented
SF0386 # 04 Y:2010 04 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,507 $7,500 Not Implemented
SF0386 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,553 $40,720 Not Implemented
SF0386 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $5,315 $18,821 Not Implemented
SF0386 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $217 $461 Not Implemented
MA0664 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $133,570 $55,950 Implemented
MA0664 # 02 Y:2010 02 2010 MINIMIZE WATER USAGE $26,438 $62,000 Not Implemented
MA0664 # 03 Y:2010 03 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,051 $34,000 Not Implemented
MA0664 # 04 Y:2010 04 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,890 $95,000 Not Implemented
MA0664 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,874 $18,345 Not Implemented