Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0556 # 07 Y:2010 | 07 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,397 | $11,734 | Not Implemented |
OR0556 # 08 Y:2010 | 08 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,479 | $65,003 | Not Implemented |
UM0369 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $8,910 | $1,680 | Implemented |
UM0369 # 02 Y:2010 | 02 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $4,068 | $10 | Not Implemented |
UM0369 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $695 | $2,500 | Implemented |
UM0369 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $443 | $2,210 | Not Implemented |
UM0369 # 05 Y:2010 | 05 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,318 | $21,700 | Implemented |
UM0369 # 06 Y:2010 | 06 | 2010 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $11,181 | $2,254 | Implemented |
UM0369 # 07 Y:2010 | 07 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,409 | $1,874 | Not Implemented |
UM0369 # 08 Y:2010 | 08 | 2010 | INSULATE FEEDWATER TANK | $1,281 | $1,449 | Not Implemented |
UM0369 # 09 Y:2010 | 09 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,164 | $1,000 | Implemented |
UM0369 # 10 Y:2010 | 10 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,010 | $1,300 | Implemented |
UW0040 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $977,184 | $420,000 | Implemented |
UW0040 # 02 Y:2010 | 02 | 2010 | KEEP BOILER TUBES CLEAN | $82,215 | $50,000 | Implemented |
UW0040 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,477 | $32,020 | Not Implemented |
MA0664 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $133,570 | $55,950 | Implemented |
MA0664 # 02 Y:2010 | 02 | 2010 | MINIMIZE WATER USAGE | $26,438 | $62,000 | Not Implemented |
MA0664 # 03 Y:2010 | 03 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $25,051 | $34,000 | Not Implemented |
MA0664 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,890 | $95,000 | Not Implemented |
MA0664 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,874 | $18,345 | Not Implemented |
MA0664 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,084 | $200 | Implemented |
NC0408 # 01 Y:2010 | 01 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,189 | $1,000 | Implemented |
NC0408 # 02 Y:2010 | 02 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,644 | $1,689 | Implemented |
NC0408 # 03 Y:2010 | 03 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $5,428 | $5,500 | Implemented |
NC0408 # 04 Y:2010 | 04 | 2010 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $712,007 | $1,750,000 | Implemented |