IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0376 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,345 $17,700 Implemented
LE0376 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $3,381 $11,736 Implemented
LE0376 # 10 Y:2014 10 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $42,779 $169,000 Not Implemented
LE0376 # 11 Y:2014 11 2014 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,052 $20,066 Implemented
OK0887 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,397 $35,374 Implemented
OK0887 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $7,219 $3,969 Implemented
OK0887 # 03 Y:2014 03 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,717 $3,613 Implemented
OK0887 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $1,814 $8,926 Implemented
OK0887 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,474 $11,975 Implemented
OK0887 # 06 Y:2014 06 2014 INSTALL TIMERS AND/OR THERMOSTATS $13,990 $0 Implemented
OK0887 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,993 $0 Implemented
WM0048 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,124 $239 Implemented
WM0048 # 02 Y:2014 02 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,624 $53,646 Implemented
WM0048 # 03 Y:2014 03 2014 REPAIR AND ELIMINATE STEAM LEAKS $2,471 $270 Implemented
WM0048 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $733 $570 Not Implemented
WM0048 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $5,162 $24,038 Implemented
SF0448 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,956 $0 Implemented
SF0448 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,452 $0 Not Implemented
SF0448 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,914 $40,248 Not Implemented
SF0448 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,941 $50 Not Implemented
SF0448 # 05 Y:2014 05 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,825 $7,952 Implemented
SF0448 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,203 $17,082 Not Implemented
CO0688 # 01 Y:2014 01 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,830 $8,050 Not Implemented
CO0688 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,390 $1,500 Implemented
CO0688 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,490 $10,380 Not Implemented