Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0010 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,834 | $40 | Implemented |
TA0010 # 04 Y:2001 | 04 | 2001 | PAY UTILITY BILLS ON TIME | $6,210 | $0 | Implemented |
TA0010 # 05 Y:2001 | 05 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,688 | $225 | Not Implemented |
TA0010 # 06 Y:2001 | 06 | 2001 | INSULATE FEEDWATER TANK | $2,564 | $181 | Implemented |
TA0010 # 07 Y:2001 | 07 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,450 | $333 | Not Implemented |
TA0010 # 08 Y:2001 | 08 | 2001 | INSTALL OCCUPANCY SENSORS | $1,319 | $460 | Implemented |
TA0010 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $755 | $984 | Implemented |
TA0010 # 10 Y:2001 | 10 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $520 | $0 | Implemented |
IC0012 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $159 | $245 | Not Implemented |
IC0012 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $996 | $2,273 | Not Implemented |
IC0012 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,581 | $24,034 | Not Implemented |
IC0012 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $1,227 | $2,450 | Not Implemented |
IC0012 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,736 | $2,070 | Not Implemented |
IC0012 # 06 Y:2001 | 06 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $22,400 | $6,000 | Not Implemented |
IC0012 # 07 Y:2001 | 07 | 2001 | AUTOMATE PAYROLL SYSTEM | $57,500 | $8,600 | Not Implemented |
UM0192 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $27,600 | $7,600 | Implemented |
UM0192 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,649 | $10,474 | Not Implemented |
UM0192 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,341 | $800 | Implemented |
UM0192 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,130 | $3,850 | Implemented |
UM0192 # 05 Y:2001 | 05 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $700 | $700 | Implemented |
UM0192 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $21,000 | $20,000 | Implemented |
UD0628 # 01 Y:2001 | 01 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $35,895 | $7,000 | Not Implemented |
UD0628 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,711 | $55,200 | Not Implemented |
UD0628 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $17,969 | $9,000 | Implemented |
UD0628 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,246 | $15,500 | Not Implemented |