Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0819 # 12 Y:2010 | 12 | 2010 | USE OPTIMUM TEMPERATURE | $492 | $25 | Not Implemented |
UD0819 # 13 Y:2010 | 13 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,008 | $6,000 | Not Implemented |
UM0368 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,687 | $124,913 | Not Implemented |
UM0368 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,110 | $6,000 | Not Implemented |
UM0368 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $2,430 | $2,852 | Not Implemented |
UM0368 # 04 Y:2010 | 04 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,139 | $333,550 | Not Implemented |
UM0368 # 05 Y:2010 | 05 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,327 | $574 | Not Implemented |
UM0368 # 06 Y:2010 | 06 | 2010 | INSTALL STORM WINDOWS AND DOORS | $1,579 | $8,070 | Not Implemented |
UM0368 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,164 | $1,000 | Not Implemented |
MA0663 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,896 | $90,000 | Not Implemented |
MA0663 # 02 Y:2010 | 02 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,239 | $24,000 | Not Implemented |
MA0663 # 03 Y:2010 | 03 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,990 | $21,410 | Not Implemented |
MA0663 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $938 | $600 | Implemented |
MA0663 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $900 | $200 | Not Implemented |
DL0050 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,623 | $100 | Not Implemented |
DL0050 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,070 | $300 | Implemented |
DL0050 # 03 Y:2010 | 03 | 2010 | INSTALL SET-BACK TIMERS | $1,236 | $300 | Not Implemented |
DL0050 # 04 Y:2010 | 04 | 2010 | COVER OPEN TANKS | $263 | $275 | Not Implemented |
DL0050 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,850 | $34,600 | Implemented |
MZ0049 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $823 | $300 | Implemented |
MZ0049 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,416 | $0 | Not Implemented |
MZ0049 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,012 | $0 | Implemented |
MZ0049 # 04 Y:2010 | 04 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $180 | $170 | Implemented |
MZ0049 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $5,075 | $6,650 | Implemented |
MZ0049 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,075 | $3,960 | Not Implemented |