IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0819 # 12 Y:2010 12 2010 USE OPTIMUM TEMPERATURE $492 $25 Not Implemented
UD0819 # 13 Y:2010 13 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,008 $6,000 Not Implemented
UM0368 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,687 $124,913 Not Implemented
UM0368 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,110 $6,000 Not Implemented
UM0368 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,430 $2,852 Not Implemented
UM0368 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,139 $333,550 Not Implemented
UM0368 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,327 $574 Not Implemented
UM0368 # 06 Y:2010 06 2010 INSTALL STORM WINDOWS AND DOORS $1,579 $8,070 Not Implemented
UM0368 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,164 $1,000 Not Implemented
MA0663 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,896 $90,000 Not Implemented
MA0663 # 02 Y:2010 02 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,239 $24,000 Not Implemented
MA0663 # 03 Y:2010 03 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,990 $21,410 Not Implemented
MA0663 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $600 Implemented
MA0663 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $200 Not Implemented
DL0050 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,623 $100 Not Implemented
DL0050 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,070 $300 Implemented
DL0050 # 03 Y:2010 03 2010 INSTALL SET-BACK TIMERS $1,236 $300 Not Implemented
DL0050 # 04 Y:2010 04 2010 COVER OPEN TANKS $263 $275 Not Implemented
DL0050 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,850 $34,600 Implemented
MZ0049 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $823 $300 Implemented
MZ0049 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,416 $0 Not Implemented
MZ0049 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,012 $0 Implemented
MZ0049 # 04 Y:2010 04 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $180 $170 Implemented
MZ0049 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $5,075 $6,650 Implemented
MZ0049 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,075 $3,960 Not Implemented