IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0019 # 06 Y:2008 06 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,660 $0 Implemented
UA0019 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $377 $520 Implemented
UA0019 # 08 Y:2008 08 2008 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,641 $11,901 Not Implemented
UA0019 # 09 Y:2008 09 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,953 $0 Not Implemented
UA0019 # 10 Y:2008 10 2008 USE RADIANT HEATER FOR SPOT HEATING $46,005 $22,000 Not Implemented
UA0019 # 11 Y:2008 11 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $48,714 $9,100 Not Implemented
UA0018 # 01 Y:2008 01 2008 UPGRADE CONTROLS ON COMPRESSORS $28,103 $15,000 Not Implemented
UA0018 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,622 $0 Implemented
UA0018 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,686 $5,000 Implemented
UA0018 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,032 $15,500 Not Implemented
UA0018 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $13,848 $6,050 Implemented
UA0018 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $5,592 $840 Implemented
UA0018 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,000 $1,000 Implemented
UA0018 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,582 $71,934 Not Implemented
UA0018 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,739 $10,237 Not Implemented
UA0018 # 10 Y:2008 10 2008 INSTALL AUTOMATIC STACK DAMPER $78,268 $3,900 Not Implemented
UA0018 # 11 Y:2008 11 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,404 $30,900 Not Implemented
UA0015 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,437 $20,527 Not Implemented
UA0015 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,846 $35,708 Not Implemented
UA0015 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $871 $5,926 Not Implemented
UA0015 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $204 $0 Implemented
UA0015 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $7,573 $823 Implemented
UA0017 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,380 $0 Implemented
UA0017 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,923 $1,050 Implemented
UA0017 # 03 Y:2008 03 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $33,016 $402 Implemented