IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0258 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $288 $25 Implemented
IA0258 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,920 $1,206 Implemented
IA0258 # 06 Y:2000 06 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $47,250 $7,175 Not Implemented
IA0258 # 07 Y:2000 07 2000 CONVERT TO AQUEOUS CLEANING SYSTEM $56,437 $420 Not Implemented
BD0167 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $500 n/a
BD0167 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $776 $1,750 n/a
BD0167 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $529 $600 n/a
BD0167 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $924 $3,400 n/a
BD0167 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $328 $1,080 n/a
BD0167 # 06 Y:2000 06 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $273,586 $375,000 n/a
OR0368 # 01 Y:2000 01 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,890 $30,000 Not Implemented
OR0368 # 02 Y:2000 02 2000 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $43,540 $401,460 Not Implemented
OR0368 # 03 Y:2000 03 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,000 $4,040 Implemented
OR0368 # 04 Y:2000 04 2000 ADD ADDITIONAL PRODUCTION SHIFT $5,000 $0 Implemented
OR0368 # 05 Y:2000 05 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,515 $1,500 Not Implemented
NV0156 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,198 $375 Not Implemented
NV0156 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,047 $4,500 Implemented
NV0156 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $160 $297 Implemented
ME0293 # 01 Y:2000 01 2000 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $19,379 $38,000 Not Implemented
ME0293 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,138 $10,890 Not Implemented
ME0293 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $4,661 $7,900 Not Implemented
ME0293 # 04 Y:2000 04 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,183 $0 Implemented
ME0293 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $200 Implemented
ME0293 # 06 Y:2000 06 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $30,516 $15,070 Not Implemented
ME0294 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,247 $27,038 n/a