IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0314 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $1,221 $525 Not Implemented
BD0314 # 08 Y:2006 08 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $421 $1,230 Not Implemented
BD0313 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $180,015 $152 Implemented
BD0313 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,962 $5,000 Implemented
BD0313 # 03 Y:2006 03 2006 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $162,249 $310,000 Not Implemented
BD0313 # 04 Y:2006 04 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,938 $0 Implemented
BD0313 # 05 Y:2006 05 2006 INSTALL TURBULATORS $2,094 $1,500 Implemented
BD0313 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,516 $0 Not Implemented
BD0313 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $800 Implemented
BD0313 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,038 $10,039 Implemented
BD0313 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $3,815 $1,275 Implemented
LM0119 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $500 $374 Not Implemented
LM0119 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $746 $0 Not Implemented
LM0119 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $859 $100 Not Implemented
LM0119 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,500 $160,200 Not Implemented
LM0119 # 05 Y:2006 05 2006 CONDENSE OPERATION INTO ONE BUILDING $39,440 $0 Not Implemented
LM0119 # 06 Y:2006 06 2006 CONDENSE OPERATION INTO ONE BUILDING $3,375,000 $500,000 Implemented
WV0343 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,166,408 $1,460,000 Not Implemented
WV0343 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,096,704 $1,539,100 Not Implemented
WV0343 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $21,955 $3,114 Implemented
WV0343 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,918 $0 Implemented
WV0343 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,836 $2,255 Not Implemented
WV0343 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $4,236 $635 Implemented
UF0382 # 01 Y:2006 01 2006 USE PHOTOCELL CONTROLS $4,721 $2,760 Not Implemented
UF0382 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,902 $900 Not Implemented