IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0027 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,185 $85,493 Not Implemented
UD0905 # 01 Y:2014 01 2014 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $13,929 $0 Not Implemented
UD0905 # 02 Y:2014 02 2014 USE OPTIMUM TEMPERATURE $5,296 $0 Implemented
UD0905 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,682 $0 Implemented
UD0905 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,046 $0 Implemented
UD0905 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,533 $188,160 Implemented
UD0905 # 06 Y:2014 06 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $437 $2,350 Not Implemented
BS0034 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $10,406 $20,000 Not Implemented
BS0034 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $74,212 $31,860 Not Implemented
BS0034 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,966 $45,410 Not Implemented
BS0034 # 04 Y:2014 04 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,073 $49,835 Not Implemented
BS0034 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $7,083 $304 Implemented
BS0034 # 06 Y:2014 06 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,513 $2,503 Implemented
BS0034 # 07 Y:2014 07 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $946 $2,100 Not Implemented
BS0034 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,850 $255 Implemented
BS0034 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,549 $4,061 Implemented
MA0732 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,190 $12,000 Not Implemented
MA0732 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,511 $29,280 Implemented
MA0732 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,880 $15,310 Implemented
MA0732 # 04 Y:2014 04 2014 AIR CONDITION ONLY SPACE NECESSARY $849 $4,000 Not Implemented
IA0519 # 01 Y:2014 01 2014 UPGRADE OBSOLETE EQUIPMENT $17,374 $52,122 Not Implemented
IA0519 # 02 Y:2014 02 2014 USE PHOTOCELL CONTROLS $1,548 $480 Implemented
IA0519 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $450 Implemented
IA0519 # 04 Y:2014 04 2014 UPGRADE OBSOLETE EQUIPMENT $178 $35 Implemented
IA0519 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,381 $3,364 Not Implemented