Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0027 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,185 | $85,493 | Not Implemented |
UD0905 # 01 Y:2014 | 01 | 2014 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $13,929 | $0 | Not Implemented |
UD0905 # 02 Y:2014 | 02 | 2014 | USE OPTIMUM TEMPERATURE | $5,296 | $0 | Implemented |
UD0905 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,682 | $0 | Implemented |
UD0905 # 04 Y:2014 | 04 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,046 | $0 | Implemented |
UD0905 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,533 | $188,160 | Implemented |
UD0905 # 06 Y:2014 | 06 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $437 | $2,350 | Not Implemented |
BS0034 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $10,406 | $20,000 | Not Implemented |
BS0034 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $74,212 | $31,860 | Not Implemented |
BS0034 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,966 | $45,410 | Not Implemented |
BS0034 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,073 | $49,835 | Not Implemented |
BS0034 # 05 Y:2014 | 05 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,083 | $304 | Implemented |
BS0034 # 06 Y:2014 | 06 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,513 | $2,503 | Implemented |
BS0034 # 07 Y:2014 | 07 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $946 | $2,100 | Not Implemented |
BS0034 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,850 | $255 | Implemented |
BS0034 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,549 | $4,061 | Implemented |
MA0732 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,190 | $12,000 | Not Implemented |
MA0732 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,511 | $29,280 | Implemented |
MA0732 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,880 | $15,310 | Implemented |
MA0732 # 04 Y:2014 | 04 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $849 | $4,000 | Not Implemented |
IA0519 # 01 Y:2014 | 01 | 2014 | UPGRADE OBSOLETE EQUIPMENT | $17,374 | $52,122 | Not Implemented |
IA0519 # 02 Y:2014 | 02 | 2014 | USE PHOTOCELL CONTROLS | $1,548 | $480 | Implemented |
IA0519 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $450 | Implemented |
IA0519 # 04 Y:2014 | 04 | 2014 | UPGRADE OBSOLETE EQUIPMENT | $178 | $35 | Implemented |
IA0519 # 05 Y:2014 | 05 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,381 | $3,364 | Not Implemented |