IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0556 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,225 $11,147 Implemented
UD0556 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,784 $0 Implemented
UD0556 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,459 $0 Implemented
UD0556 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $1,680 $2,250 Implemented
UD0556 # 08 Y:1998 08 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $532 $200 Implemented
NC0146 # 01 Y:1998 01 1998 COVER OPEN TANKS $488 $600 Implemented
NC0146 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $920 $800 Implemented
NC0146 # 03 Y:1998 03 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $409 $1,480 Implemented
NC0146 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $178 $200 Implemented
NC0146 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,890 $1,500 Implemented
NC0146 # 06 Y:1998 06 1998 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $2,431 $0 Implemented
OK0552 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,497 $26,747 Implemented
OK0552 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,699 $25,866 Not Implemented
OK0552 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $819 $700 Implemented
OK0552 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $873 $651 Implemented
OK0552 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $142 $54 Implemented
OK0552 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $581 $375 Implemented
OK0552 # 07 Y:1998 07 1998 REDUCE EXCESSIVE BOILER BLOWDOWN $1,324 $5,000 Implemented
OK0552 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $193 $209 Implemented
OK0552 # 09 Y:1998 09 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,072 $7,000 Not Implemented
OK0552 # 10 Y:1998 10 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,474 $6,000 Not Implemented
OK0552 # 11 Y:1998 11 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,909 $15,000 Not Implemented
OK0552 # 12 Y:1998 12 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,291 $3,000 Not Implemented
CO0422 # 01 Y:1998 01 1998 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,830 $0 Implemented
CO0422 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $1,292 Not Implemented