IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0188 # 05 Y:2001 05 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,358 $6,500 Not Implemented
WV0220 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,623 $3,010 Implemented
WV0220 # 02 Y:2001 02 2001 USE PHOTOCELL CONTROLS $432 $300 Implemented
WV0220 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,633 $540 Implemented
WV0220 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $804 $54 Implemented
WV0220 # 05 Y:2001 05 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $241 $36 Implemented
WV0220 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,872 $1,457 Not Implemented
WV0220 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,626 $190 Implemented
WV0220 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,369 $708 Not Implemented
WV0220 # 09 Y:2001 09 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,742 $3,132 Not Implemented
WV0220 # 10 Y:2001 10 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,164 $1,080 Implemented
WV0220 # 11 Y:2001 11 2001 BURN WASTE OIL FOR HEAT $3,635 $4,700 Not Implemented
WV0220 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,188 $7,000 Not Implemented
WV0220 # 13 Y:2001 13 2001 ADD ADDITIONAL PRODUCTION SHIFT $110,160 $63,182 Not Implemented
GT0716 # 01 Y:2001 01 2001 REDESIGN PROCESS $807,905 $500,000 n/a
GT0716 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $12,800 $0 n/a
GT0716 # 03 Y:2001 03 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $201 $450 n/a
GT0716 # 04 Y:2001 04 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,000 $2,000 n/a
GT0716 # 05 Y:2001 05 2001 FILTER AND REUSE HYDRAULIC OIL $9,825 $0 n/a
GT0716 # 06 Y:2001 06 2001 FILTER AND REUSE HYDRAULIC OIL $18,150 $5,900 n/a
WI0403 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $82,500 $120,000 Not Implemented
WI0403 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,523 $0 Implemented
WI0403 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,035 $9,500 Not Implemented
WI0403 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,569 $16,804 Not Implemented
WI0403 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $188 $630 Implemented