IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0001 # 05 Y:2017 05 2017 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,143 $50 Not Implemented
TR0001 # 06 Y:2017 06 2017 INSTALL REPLACEMENT DOORS $9,766 $5,000 Implemented
TR0001 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,442 $2,500 Implemented
TR0001 # 08 Y:2017 08 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,422 $6 Implemented
WM0104 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,927 $33,500 Not Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
WM0104 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $11,736 $45,000 Not Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
WM0104 # 06 Y:2017 06 2017 USE SYNTHETIC LUBRICANT $7,607 $650 Not Implemented
WM0104 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,589 $554 Not Implemented
WM0104 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $64,540 $93,226 Not Implemented
IP0085 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,588 $155 Not Implemented
IP0085 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,570 $963 Not Implemented
IP0085 # 06 Y:2017 06 2017 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,250 $2,002 Not Implemented
IP0085 # 07 Y:2017 07 2017 UPGRADE CONTROLS ON COMPRESSORS $18,232 $10,662 Not Implemented
IP0085 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $989 $804 Not Implemented
IP0085 # 09 Y:2017 09 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $448,362 $2,150,000 Not Implemented
IP0086 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,463 $0 Implemented
IP0086 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,932 $4 Not Implemented
IP0086 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,016 $90 Not Implemented
IP0086 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $8 Implemented
IP0086 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,071 $775 Not Implemented
IP0086 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,677 $1,400 Not Implemented
IP0086 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,028 $7,975 Not Implemented
IP0086 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $522 $204 Implemented