IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0145 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,250 $6,500 Not Implemented
BS0145 # 03 Y:2021 03 2021 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $46,312 $106,140 Not Implemented
BS0145 # 04 Y:2021 04 2021 REPAIR OR REPLACE STEAM TRAPS $22,793 $7,115 Not Implemented
BS0145 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $3,700 Not Implemented
DL0189 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,300 $425 Implemented
DL0189 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,750 $2,550 Not Implemented
DL0189 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,300 $3,250 Not Implemented
DL0189 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,940 $20,000 Implemented
DL0189 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,110 $72,258 Implemented
DL0189 # 06 Y:2021 06 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,820 $24,000 Implemented
DL0189 # 07 Y:2021 07 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $24,980 $15,000 Not Implemented
WM0161 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $16,973 $200,736 Not Implemented
WM0161 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,205 $65,400 Not Implemented
WM0161 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,441 $2,950 Not Implemented
WM0161 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $7,387 Not Implemented
WM0161 # 05 Y:2021 05 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,170 $3,300 Not Implemented
WM0161 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,245 $1,200 Not Implemented
WM0161 # 07 Y:2021 07 2021 USE COMPRESSOR AIR FILTERS $940 $2,186 Not Implemented
WM0161 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $233 $660 Not Implemented
WM0161 # 09 Y:2021 09 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $933 Not Implemented
TT0250 # 01 Y:2021 01 2021 INCREASE EFFICIENCY OF TRUCKS $17,586 $0 Implemented
TT0250 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,326 $27,000 Implemented
TT0250 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,205 $3,000 Not Implemented
TT0250 # 04 Y:2021 04 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $2,240 $4,500 Implemented
TT0250 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,600 $160 Not Implemented