Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0224 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,382 Implemented
OK1096 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,791 $464,597 Implemented
OK1096 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,865 $10,337 Implemented
OK1096 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,151 $0 Not Implemented
OK1096 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $1,354 Implemented
OK1096 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,239 $0 Not Implemented
OK1096 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $148,192 $1,704,000 Not Implemented
OK1096 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $394,679 $75,000 Implemented
OK1096 # 08 Y:2023 08 2023 MAINTAIN MACHINES TO REDUCE LEAKS $2,796 $500 Implemented
UC2308 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $204,687 $50,000 Implemented
UC2308 # 02 Y:2023 02 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,561 $0 Implemented
UC2308 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,353 $987 Implemented
UC2308 # 04 Y:2023 04 2023 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $55,687 $171,637 Not Implemented
UC2308 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,549 $428 Not Implemented
UC2308 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,434 $300 Implemented
UC2308 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,525 $1,300 Not Implemented
UC2308 # 08 Y:2023 08 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,939 $27,365 Not Implemented
UC2308 # 09 Y:2023 09 2023 INSTALL TIMERS AND/OR THERMOSTATS $998 $3,691 Implemented
UC2308 # 10 Y:2023 10 2023 ADOPT IN-HOUSE MATERIAL GENERATION $207,659 $464,727 Not Implemented
UC2308 # 11 Y:2023 11 2023 MODIFY STARTUP/SHUTDOWN TIMES $11,360 $7,140 Not Implemented
UC2308 # 12 Y:2023 12 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $85,414 $609,968 Not Implemented
MZ0347 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $3,495 $1,500 Not Implemented
MZ0347 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,034 $35,384 Implemented
MZ0347 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,827 $220 Not Implemented
MZ0347 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,683 $0 Implemented