IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0362 # 03 Y:2007 03 2007 DEVELOP A REPAIR/REPLACE POLICY $3,512 $3,546 Not Implemented
NC0362 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,160 $50 Not Implemented
NC0362 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $537 Not Implemented
NC0362 # 06 Y:2007 06 2007 MAKE A NEW BY-PRODUCT $655,523 $2,000,000 Not Implemented
LE0254 # 01 Y:2007 01 2007 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $81,900 $65,000 Not Implemented
LE0254 # 02 Y:2007 02 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $67,570 $67,000 Not Implemented
LE0254 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,157 $20,000 Not Implemented
LE0254 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,686 $20,000 Implemented
LE0254 # 05 Y:2007 05 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,471 $800 Not Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented
LE0254 # 07 Y:2007 07 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,029 $800 Not Implemented
LE0255 # 01 Y:2007 01 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $433,831 $500 Implemented
LE0255 # 02 Y:2007 02 2007 IMPROVE SPACE COMFORT CONDITIONING $44,000 $3,000 Not Implemented
LE0255 # 03 Y:2007 03 2007 REPAIR OR REPLACE STEAM TRAPS $23,595 $5,000 Implemented
LE0255 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,641 $29,600 Implemented
LE0255 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,252 $1,000 Implemented
LE0255 # 06 Y:2007 06 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,146 $21,000 Not Implemented
LE0255 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,471 $1,500 Not Implemented
LE0255 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $3,186 $420 Not Implemented
LE0255 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,278 $2,500 Not Implemented
NC0361 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,209 $1,540 Implemented
NC0361 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,791 $1,674 Implemented
NC0361 # 03 Y:2007 03 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,894 $19,950 Not Implemented
NC0361 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $658 $617 Implemented
NC0361 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $579 $100 Implemented