IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0670 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,800 $620 Implemented
CO0670 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,160 $330 Implemented
CO0670 # 05 Y:2013 05 2013 USE EVAPORATION TO CONCENTRATE MATERIAL $660 $0 Implemented
CO0670 # 06 Y:2013 06 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,080 $500 Implemented
UA3027 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $3,385 $8,470 Not Implemented
UA3027 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $978 $330 Not Implemented
UA3027 # 03 Y:2013 03 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,732 $15,725 Not Implemented
UA3027 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,525 $400 Not Implemented
UA3027 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $5,898 $6,420 Not Implemented
SF0436 # 01 Y:2013 01 2013 COVER OPEN TANKS $6,314 $150 Not Implemented
SF0436 # 02 Y:2013 02 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $438 $0 Implemented
SF0436 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $2,488 $3,272 Not Implemented
SF0436 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $864 $2,751 Not Implemented
SF0436 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,275 $12,405 Not Implemented
SF0436 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $608 $2,400 Not Implemented
DL0106 # 01 Y:2013 01 2013 REDUCE VENTILATION AIR $50,820 $2,200 Implemented
DL0106 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $28,083 $1,516 Implemented
DL0106 # 03 Y:2013 03 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $58,740 $5,580 Not Implemented
DL0106 # 04 Y:2013 04 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $102,000 $2,375,000 Implemented
DL0106 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $81,500 $11,200 Not Implemented
OK0861 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,427 $1,250 Implemented
OK0861 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,478 $1,026 Not Implemented
OK0861 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,425 $1,378 Not Implemented
OK0861 # 04 Y:2013 04 2013 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $834 $3,110 Not Implemented
OK0861 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,689 $13,383 Not Implemented