IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0438 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,264 $710 Implemented
LE0438 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,655 $10,500 Implemented
LE0438 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,106 $13,000 Not Implemented
LE0438 # 06 Y:2017 06 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $185,116 $366,000 Implemented
LE0438 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,862 $19,575 Not Implemented
LE0438 # 08 Y:2017 08 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $19,166 $53,000 Not Implemented
LE0438 # 09 Y:2017 09 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $9,816 $47,000 Not Implemented
WM0104 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $64,540 $93,226 Not Implemented
WM0104 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,927 $33,500 Not Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
WM0104 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $11,736 $45,000 Not Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
WM0104 # 06 Y:2017 06 2017 USE SYNTHETIC LUBRICANT $7,607 $650 Not Implemented
WM0104 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,589 $554 Not Implemented
UF0507 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,676 $1,124 Implemented
UF0507 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,643 $3,762 Implemented
UF0507 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,363 $210 Implemented
UF0507 # 04 Y:2017 04 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $814 $876 Implemented
UF0507 # 05 Y:2017 05 2017 INSTALL AN UNINTERUPTABLE POWER SUPPLY $14,679 $43,710 Not Implemented
UF0507 # 06 Y:2017 06 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,808 $0 Implemented
IC0193 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79,158 $193,800 Implemented
IC0193 # 02 Y:2017 02 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $53,319 $1,029,975 Not Implemented
IC0193 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,932 $14,716 Implemented
IC0193 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $2,517 $7,106 Not Implemented
IC0193 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $1,847 Implemented