IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0067 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,775 $15,000 Not Implemented
IP0067 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $5,105 $12,251 Not Implemented
IP0067 # 12 Y:2016 12 2016 APPLY FOR INVESTMENT INCENTIVES $4,112 $10,000 Implemented
IP0067 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,007 $58,641 Not Implemented
IP0067 # 14 Y:2016 14 2016 INSULATE BARE EQUIPMENT $40 $167 Implemented
IP0067 # 15 Y:2016 15 2016 COVER OPEN TANKS $578 $2,692 Not Implemented
AM0710 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $9,400 $9,540 Not Implemented
AM0710 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $27 Implemented
AM0710 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,600 $1,160 Implemented
AM0710 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $2,944 $0 Implemented
AM0710 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,635 $0 Implemented
AM0710 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,170 $2,100 Implemented
AM0710 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $400 $750 Not Implemented
SF0483 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,773 $0 Implemented
SF0483 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,441 $2,520 Implemented
SF0483 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,855 $16,147 Implemented
SF0483 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,458 $15,229 Implemented
SF0483 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,391 $47,502 Not Implemented
SF0483 # 06 Y:2016 06 2016 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $720 $4,000 Not Implemented
MZ0215 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,397 $8,400 Implemented
MZ0215 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $2,514 $1,500 Implemented
MZ0215 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $1,093 $220 Implemented
MZ0215 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Not Implemented
SD0530 # 01 Y:2016 01 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,594 $36,400 Implemented
SD0530 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,344 $1,500 Implemented