Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0306 # 02 Y:1997 | 02 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,780 | $0 | Implemented |
OR0306 # 03 Y:1997 | 03 | 1997 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $18,530 | $5,000 | Not Implemented |
OR0306 # 04 Y:1997 | 04 | 1997 | DISCONNECT BALLASTS | $2,422 | $3,120 | Not Implemented |
OR0306 # 05 Y:1997 | 05 | 1997 | UPGRADE OBSOLETE EQUIPMENT | $80 | $0 | Implemented |
OR0305 # 01 Y:1997 | 01 | 1997 | REDUCE SCRAP PRODUCTION | $89,400 | $15,300 | Not Implemented |
OR0305 # 02 Y:1997 | 02 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $24,200 | $139,000 | Not Implemented |
OR0305 # 03 Y:1997 | 03 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,130 | $1,200 | Implemented |
OR0305 # 04 Y:1997 | 04 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $8,400 | $4,900 | Implemented |
OR0305 # 05 Y:1997 | 05 | 1997 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $1,990 | $0 | Implemented |
OR0305 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,860 | $2,500 | Implemented |
OR0303 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,120 | $250 | Implemented |
OR0303 # 02 Y:1997 | 02 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $3,730 | $1,300 | Implemented |
OR0303 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $490 | $1,000 | Implemented |
OR0303 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $606 | $2,109 | Implemented |
OR0303 # 05 Y:1997 | 05 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $4,030 | $1,400 | Implemented |
OR0303 # 06 Y:1997 | 06 | 1997 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $34,750 | $69,300 | Implemented |
OR0304 # 01 Y:1997 | 01 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $13,502 | $0 | Implemented |
OR0304 # 02 Y:1997 | 02 | 1997 | OPTIMIZE PLANT POWER FACTOR | $1,070 | $3,200 | Not Implemented |
OR0304 # 03 Y:1997 | 03 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $9,530 | $0 | Implemented |
OR0304 # 04 Y:1997 | 04 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $450 | $500 | Implemented |
OR0304 # 05 Y:1997 | 05 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,881 | $1,560 | Not Implemented |
OR0304 # 06 Y:1997 | 06 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,300 | $0 | Implemented |
OR0304 # 07 Y:1997 | 07 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,988 | $5,910 | Implemented |
OR0304 # 08 Y:1997 | 08 | 1997 | MINIMIZE WATER USAGE | $4,000 | $0 | Not Implemented |
OR0304 # 09 Y:1997 | 09 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $0 | $250 | Not Implemented |