Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,059
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0507 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,601 | $338 | Implemented |
WI0507 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,034 | $30 | Implemented |
WI0507 # 07 Y:2006 | 07 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $856 | $400 | Not Implemented |
WI0507 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $688 | $1,280 | Implemented |
WI0507 # 09 Y:2006 | 09 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $444 | $200 | Implemented |
WI0506 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,973 | $16,740 | Implemented |
WI0506 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,049 | $0 | Implemented |
WI0506 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,464 | $0 | Not Implemented |
WI0506 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,464 | $1,000 | Implemented |
WI0506 # 05 Y:2006 | 05 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,795 | $800 | Implemented |
WI0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,430 | $0 | Implemented |
WI0506 # 07 Y:2006 | 07 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $990 | $1,500 | Implemented |
WI0505 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $105,600 | $2,700 | Implemented |
WI0505 # 02 Y:2006 | 02 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $38,400 | $1,000 | Not Implemented |
WI0505 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,774 | $6,289 | Implemented |
WI0505 # 04 Y:2006 | 04 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,380 | $3,200 | Not Implemented |
WI0505 # 05 Y:2006 | 05 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,205 | $7,840 | Implemented |
WI0505 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,153 | $0 | Implemented |
WI0504 # 01 Y:2006 | 01 | 2006 | MODIFY WORKLOAD | $43,120 | $4,500 | Implemented |
WI0504 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,551 | $47,880 | Implemented |
WI0504 # 03 Y:2006 | 03 | 2006 | COVER OPEN TANKS | $5,547 | $1,620 | Not Implemented |
WI0504 # 04 Y:2006 | 04 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,466 | $1,840 | Implemented |
WI0504 # 05 Y:2006 | 05 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $3,606 | $800 | Not Implemented |
WI0504 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,907 | $1,280 | Implemented |
WI0504 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $157 | $0 | Implemented |