IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0507 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,601 $338 Implemented
WI0507 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,034 $30 Implemented
WI0507 # 07 Y:2006 07 2006 INSTALL TIMERS AND/OR THERMOSTATS $856 $400 Not Implemented
WI0507 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $688 $1,280 Implemented
WI0507 # 09 Y:2006 09 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $444 $200 Implemented
WI0506 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,973 $16,740 Implemented
WI0506 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,049 $0 Implemented
WI0506 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,464 $0 Not Implemented
WI0506 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,464 $1,000 Implemented
WI0506 # 05 Y:2006 05 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $800 Implemented
WI0506 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $0 Implemented
WI0506 # 07 Y:2006 07 2006 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $990 $1,500 Implemented
WI0505 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $105,600 $2,700 Implemented
WI0505 # 02 Y:2006 02 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $38,400 $1,000 Not Implemented
WI0505 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,774 $6,289 Implemented
WI0505 # 04 Y:2006 04 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,380 $3,200 Not Implemented
WI0505 # 05 Y:2006 05 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,205 $7,840 Implemented
WI0505 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,153 $0 Implemented
WI0504 # 01 Y:2006 01 2006 MODIFY WORKLOAD $43,120 $4,500 Implemented
WI0504 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,551 $47,880 Implemented
WI0504 # 03 Y:2006 03 2006 COVER OPEN TANKS $5,547 $1,620 Not Implemented
WI0504 # 04 Y:2006 04 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,466 $1,840 Implemented
WI0504 # 05 Y:2006 05 2006 INSTALL TIMERS AND/OR THERMOSTATS $3,606 $800 Not Implemented
WI0504 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,907 $1,280 Implemented
WI0504 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $157 $0 Implemented