Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,795

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0687 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $8,882 Not Implemented
OK0686 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,360 $160 Not Implemented
OK0686 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,472 $262 Implemented
OK0686 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $3,350 $1,136 Implemented
OK0686 # 04 Y:2004 04 2004 INSTALL SET-BACK TIMERS $1,577 $1,320 Implemented
OK0686 # 05 Y:2004 05 2004 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $70,533 $81,950 Not Implemented
OK0686 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $36,618 Implemented
OK0686 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $2,550 Implemented
OK0686 # 08 Y:2004 08 2004 USE OPTIMUM THICKNESS INSULATION $8,220 $40,318 Not Implemented
OK0686 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,706 $22,116 Not Implemented
OK0685 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265,308 $559,374 Implemented
OK0685 # 02 Y:2004 02 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,694 $34,154 Implemented
OK0685 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $23,175 $1,573 Implemented
OK0685 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $9,972 $3,312 Implemented
OK0685 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $11,632 $6,246 Not Implemented
OK0685 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,053 $2,023 Implemented
OK0685 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,698 $1,250 Not Implemented
OK0684 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $32,832 $29,700 Not Implemented
OK0684 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,754 $11,650 Not Implemented
OK0684 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,784 $11,990 Not Implemented
OK0684 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,056 $656 Not Implemented
OK0684 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,502 $0 Not Implemented
OK0684 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,158 $5,157 Not Implemented
OK0684 # 07 Y:2004 07 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,565 $789 Not Implemented
OK0684 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,192 $655 Not Implemented