Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0065 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $4,060 | $5,520 | Not Implemented |
UU0065 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,450 | $0 | Implemented |
UU0065 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,345 | $1,100 | Implemented |
UU0065 # 04 Y:2004 | 04 | 2004 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,188 | $225 | Implemented |
UU0065 # 05 Y:2004 | 05 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,650 | $675 | Not Implemented |
MI0089 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $13,096 | $600 | Not Implemented |
MI0089 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,325 | $2,300 | Implemented |
MI0089 # 03 Y:2004 | 03 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $15,302 | $270 | Not Implemented |
MI0089 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,010 | $590 | Implemented |
MI0089 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,036 | $50 | Implemented |
MI0089 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,772 | $25,286 | Implemented |
MI0089 # 07 Y:2004 | 07 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,783 | $4,328 | Not Implemented |
LM0082 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $13,838 | $26,170 | n/a |
LM0082 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $474 | $65 | n/a |
LM0082 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $123 | $169 | n/a |
LM0082 # 04 Y:2004 | 04 | 2004 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $13,000 | $5,400 | n/a |
LM0082 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $856 | $0 | n/a |
LE0195 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $575,674 | $984,000 | Not Implemented |
LE0195 # 02 Y:2004 | 02 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $29,156 | $14,088 | Not Implemented |
LE0195 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $33,048 | $40,000 | Not Implemented |
LE0195 # 04 Y:2004 | 04 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,946 | $48,000 | Implemented |
LE0195 # 05 Y:2004 | 05 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,168 | $6,683 | Implemented |
LE0195 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,604 | $40,000 | Not Implemented |
LE0195 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,095 | $0 | Implemented |
LE0195 # 08 Y:2004 | 08 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,089 | $0 | Implemented |