IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0260 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $423 $60 n/a
AS0260 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,157 $240 n/a
AS0260 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,639 $1,060 n/a
AS0260 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,300 $30 n/a
AS0260 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $970 $0 n/a
AS0259 # 01 Y:1999 01 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,440 $3,500 Not Implemented
AS0259 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $623 $1,400 Not Implemented
AS0259 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $155 $100 Not Implemented
AS0259 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $242 $240 Not Implemented
AS0259 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,717 $120 Not Implemented
AS0259 # 06 Y:1999 06 1999 RECOVER AND REUSE COOLING WATER $27 $38 Not Implemented
AS0259 # 07 Y:1999 07 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $34,440 $1,220 Not Implemented
AS0258 # 01 Y:1999 01 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,211 $7,000 Not Implemented
AS0258 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,462 Not Implemented
AS0258 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $7,596 $8,925 Not Implemented
AS0258 # 04 Y:1999 04 1999 USE SYNTHETIC LUBRICANT $2,076 $2,889 Not Implemented
AS0258 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,388 $121,971 Not Implemented
AS0258 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $240 Not Implemented
AS0258 # 07 Y:1999 07 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,913 $3,123 Not Implemented
AS0258 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,628 $20,250 Not Implemented
AS0258 # 09 Y:1999 09 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $10,564 $6,100 Not Implemented
AS0258 # 10 Y:1999 10 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $49,340 $21,154 Not Implemented
AS0258 # 11 Y:1999 11 1999 FILTER AND REUSE HYDRAULIC OIL $32,354 $1,600 Not Implemented
AS0258 # 12 Y:1999 12 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,235 $30 Not Implemented
AS0258 # 13 Y:1999 13 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $321,600 $53,760 Not Implemented