IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0301 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $6,429 $9,875 Not Implemented
UM0301 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,344 $500 Not Implemented
UM0301 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,457 $375 Implemented
UM0301 # 06 Y:2006 06 2006 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,498 $738 Not Implemented
UM0301 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,325 $0 Implemented
UM0301 # 08 Y:2006 08 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,415 $1,363 Not Implemented
UM0301 # 09 Y:2006 09 2006 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $328 $328 Not Implemented
UM0301 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,062 $300 Not Implemented
UM0301 # 11 Y:2006 11 2006 RECOVER WASTE HEAT FROM EQUIPMENT $218 $500 Not Implemented
UM0300 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $15,780 $14,167 Implemented
UM0300 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,203 $2,500 Implemented
UM0300 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,520 $515 Implemented
UM0300 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,993 $500 Implemented
UM0300 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $560 Implemented
UM0300 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $696 $825 Implemented
UM0300 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $537 $1,000 Implemented
UM0300 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $75 Implemented
MS0296 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $57,344 $3,269 Implemented
MS0296 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,954 $113,910 Not Implemented
MS0296 # 03 Y:2006 03 2006 REPAIR AND ELIMINATE STEAM LEAKS $33,575 $374 Implemented
MS0296 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,105 $51,885 Not Implemented
MS0296 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,082 $6,420 Implemented
MS0296 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,895 $12,886 Not Implemented
LM0117 # 01 Y:2006 01 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $125,343 $20,000 Implemented
LM0117 # 02 Y:2006 02 2006 INSTALL BACK-UP EQUIPMENT $86,200 $105,000 Implemented