IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0262 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,293 $1,410 Not Implemented
UM0262 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,197 $500 Not Implemented
UM0262 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,427 $1,910 Not Implemented
UM0262 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $1,248 Implemented
UM0262 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $4,751 $27,856 Not Implemented
UM0262 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $639 $1,000 Not Implemented
IC0083 # 01 Y:2004 01 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $31,787 $32,056 Not Implemented
IC0083 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,453 $2,048 Implemented
IC0083 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $239 $508 Not Implemented
IC0083 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,166 $18,190 Not Implemented
UM0261 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $96,676 $11,096 Not Implemented
UM0261 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,377 $47,700 Not Implemented
UM0261 # 03 Y:2004 03 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,493 $2,000 Implemented
UM0261 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $6,503 $500 Implemented
UM0261 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,770 $1,711 Implemented
UM0261 # 06 Y:2004 06 2004 COVER OPEN TANKS $625 $300 Implemented
UM0260 # 01 Y:2004 01 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,413 $10,000 Not Implemented
UM0260 # 02 Y:2004 02 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $33,620 $12,000 Implemented
UM0260 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,181 $13,690 Not Implemented
UM0260 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,671 $1,000 Implemented
UM0260 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,831 $2,000 Implemented
UM0260 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,283 $1,050 Implemented
UM0260 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,054 $1,564 Not Implemented
UM0259 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $40,040 $58,000 Not Implemented
UM0259 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,534 $43,000 Not Implemented