IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0924 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $56,347 $2,000 Implemented
UD0924 # 02 Y:2015 02 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,953 $0 Not Implemented
UD0924 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,906 $1,200 Implemented
UD0924 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,861 $0 Not Implemented
UD0924 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,293 $470 Implemented
UD0924 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $22,071 $7,500 Implemented
UD0924 # 07 Y:2015 07 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $16,794 $0 Not Implemented
UD0924 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,134 $0 Not Implemented
UD0924 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $16,525 $6,100 Implemented
UD0924 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $67,200 Implemented
UD0924 # 11 Y:2015 11 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,383 $0 Not Implemented
UD0924 # 12 Y:2015 12 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,382 $0 Implemented
UD0924 # 13 Y:2015 13 2015 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $357,410 $0 Not Implemented
UD0923 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,241 $50 Implemented
UD0923 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $243 $400 Not Implemented
UD0923 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $28,993 $2,000 Not Implemented
UD0923 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,909 $10,000 Not Implemented
UD0923 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $4,777 $600 Not Implemented
UD0923 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,021 $400 Not Implemented
UD0923 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,734 $0 Implemented
UD0923 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $5,978 $19,581 Implemented
UD0923 # 09 Y:2015 09 2015 COMBINE UTILITY METERS $105,406 $156,400 Not Implemented
UD0923 # 10 Y:2015 10 2015 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $343 $0 Implemented
UD0922 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,816 $0 Not Implemented
UD0922 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,063 $4,947 Not Implemented