Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0924 # 01 Y:2015 | 01 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $56,347 | $2,000 | Implemented |
UD0924 # 02 Y:2015 | 02 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,953 | $0 | Not Implemented |
UD0924 # 03 Y:2015 | 03 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $38,906 | $1,200 | Implemented |
UD0924 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,861 | $0 | Not Implemented |
UD0924 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,293 | $470 | Implemented |
UD0924 # 06 Y:2015 | 06 | 2015 | INSULATE BARE EQUIPMENT | $22,071 | $7,500 | Implemented |
UD0924 # 07 Y:2015 | 07 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $16,794 | $0 | Not Implemented |
UD0924 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,134 | $0 | Not Implemented |
UD0924 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $16,525 | $6,100 | Implemented |
UD0924 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,695 | $67,200 | Implemented |
UD0924 # 11 Y:2015 | 11 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,383 | $0 | Not Implemented |
UD0924 # 12 Y:2015 | 12 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,382 | $0 | Implemented |
UD0924 # 13 Y:2015 | 13 | 2015 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $357,410 | $0 | Not Implemented |
UD0923 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,241 | $50 | Implemented |
UD0923 # 02 Y:2015 | 02 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $243 | $400 | Not Implemented |
UD0923 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM THICKNESS INSULATION | $28,993 | $2,000 | Not Implemented |
UD0923 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,909 | $10,000 | Not Implemented |
UD0923 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $4,777 | $600 | Not Implemented |
UD0923 # 06 Y:2015 | 06 | 2015 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,021 | $400 | Not Implemented |
UD0923 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,734 | $0 | Implemented |
UD0923 # 08 Y:2015 | 08 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $5,978 | $19,581 | Implemented |
UD0923 # 09 Y:2015 | 09 | 2015 | COMBINE UTILITY METERS | $105,406 | $156,400 | Not Implemented |
UD0923 # 10 Y:2015 | 10 | 2015 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $343 | $0 | Implemented |
UD0922 # 01 Y:2015 | 01 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $31,816 | $0 | Not Implemented |
UD0922 # 02 Y:2015 | 02 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,063 | $4,947 | Not Implemented |