IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0117 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $701 $335 Not Implemented
BD0117 # 07 Y:1998 07 1998 INSTALL TURBULATORS $277 $500 Implemented
BD0117 # 08 Y:1998 08 1998 USE SYNTHETIC LUBRICANT $238 $400 Not Implemented
BD0117 # 09 Y:1998 09 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $164 $250 Not Implemented
BD0117 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,584 $1,500 Implemented
BD0117 # 11 Y:1998 11 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $16,484 $10,000 Implemented
MA0418 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,132 $1,000,000 Not Implemented
MA0418 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,390 $35,000 Not Implemented
MA0418 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $7,983 Not Implemented
MA0418 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $163 $261 Implemented
MA0418 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $138 $0 Implemented
ME0251 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $2,487 $600 Implemented
ME0251 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,440 $0 Not Implemented
ME0251 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,240 $2,100 Implemented
ME0251 # 04 Y:1998 04 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,020 $400 Implemented
ME0251 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $448 $0 Implemented
ME0251 # 06 Y:1998 06 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $160,875 $31,200 Implemented
ME0251 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,200 $1,850 Not Implemented
SF0146 # 01 Y:1998 01 1998 REPAIR AND ELIMINATE STEAM LEAKS $3,822 $600 Implemented
SF0146 # 02 Y:1998 02 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $565 $560 Implemented
SF0146 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $563 $575 Not Implemented
SF0146 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $4,745 Implemented
SF0146 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $182 $513 Implemented
SF0146 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $336 $1,456 Not Implemented
SF0146 # 07 Y:1998 07 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $862 $0 Implemented