IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0140 # 14 Y:1999 14 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,200 $16,000 Implemented
KU0522 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,170 $710 Implemented
KU0522 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,840 $1,410 Not Implemented
KU0522 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $470 $0 Implemented
KU0522 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $250 $500 Not Implemented
KU0522 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,710 $1,100 Implemented
KU0522 # 06 Y:1999 06 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,600 $4,500 Implemented
OR0347 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,755 $9,290 Not Implemented
OR0347 # 02 Y:1999 02 1999 UPGRADE CONTROLS ON COMPRESSORS $21,932 $6,000 Implemented
OR0347 # 03 Y:1999 03 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,610,000 $93,000 Implemented
OR0347 # 04 Y:1999 04 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $327,800 $87,400 Implemented
OD0143 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $143 $4,584 Not Implemented
OD0143 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $373 $700 Not Implemented
OD0143 # 03 Y:1999 03 1999 UPGRADE CONTROLS ON COMPRESSORS $2,739 $140 Not Implemented
OD0143 # 04 Y:1999 04 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $228 $130 Implemented
OD0143 # 05 Y:1999 05 1999 SELL COMBUSTIBLE WASTE $1,835 $0 Not Implemented
WV0177 # 01 Y:1999 01 1999 USE SYNTHETIC LUBRICANT $302 $400 Implemented
WV0177 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $121 $225 Not Implemented
WV0177 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $270 $450 Implemented
WV0177 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $697 $0 Implemented
WV0177 # 05 Y:1999 05 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $3,419 $4,965 Implemented
WV0177 # 06 Y:1999 06 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,120 $300 Implemented
WV0177 # 07 Y:1999 07 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,300 $40 Implemented
WV0177 # 08 Y:1999 08 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,500 $500 Not Implemented
WV0177 # 09 Y:1999 09 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $6,500 $0 Implemented