IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0762 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,706 $7,000 Not Implemented
UD0762 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,709 $1,465 Implemented
UD0762 # 08 Y:2007 08 2007 DISCONNECT BALLASTS $1,029 $180 Not Implemented
MA0618 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,879 $79,554 Implemented
MA0618 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,820 $26,621 Implemented
MA0618 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,316 $3,220 Implemented
MA0618 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,204 $29,875 Implemented
MA0618 # 05 Y:2007 05 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,589 $17,740 Implemented
MA0618 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $7,795 $1,924 Implemented
MA0618 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $4,906 $18,500 Implemented
MA0618 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,125 $3,552 Implemented
MA0618 # 09 Y:2007 09 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,070 $340 Implemented
IA0406 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,718 $500 Implemented
IA0406 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $896 $100 Implemented
IA0406 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $364 $25 Implemented
IA0406 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $7,396 $1,000 Not Implemented
IA0406 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $386 $55 Not Implemented
IA0406 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $507 $100 Implemented
IA0406 # 07 Y:2007 07 2007 USE RADIANT HEATER FOR SPOT HEATING $21,600 $10,000 Implemented
MS0315 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,119 $27,463 Not Implemented
MS0315 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,525 $337 Not Implemented
MS0315 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,069 $153 Implemented
MS0315 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $959 $18,627 Not Implemented
MS0315 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $767 $1,950 Not Implemented
AM0530 # 01 Y:2007 01 2007 PURCHASE APPROPRIATELY SIZED MATERIAL $13,025 $500 Not Implemented