IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0669 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,966 $3,467 Implemented
OK0669 # 06 Y:2003 06 2003 INSTALL SET-BACK TIMERS $1,069 $463 Implemented
OK0669 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $6,052 $1,468 Implemented
OK0668 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,150 $61,955 Not Implemented
OK0668 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,013 $38,456 Implemented
OK0668 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $6,113 $1,885 Implemented
OK0668 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,597 $0 Implemented
OK0668 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,238 $0 Implemented
OK0668 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,821 $1,125 Implemented
OK0668 # 07 Y:2003 07 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $50,260 $51,780 Not Implemented
OK0668 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,772 $9,500 Not Implemented
OK0668 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,369 $1,455 Implemented
OK0668 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,501 $6,296 Not Implemented
OK0668 # 11 Y:2003 11 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,447 $112,608 n/a
OK0668 # 12 Y:2003 12 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,404 $34,425 n/a
OK0668 # 13 Y:2003 13 2003 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $38,034 $1,647 Implemented
OK0667 # 01 Y:2003 01 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,098 $4,390 Not Implemented
OK0667 # 02 Y:2003 02 2003 RECOVER AND REUSE WASTE MATERIAL $1,957 $564 Not Implemented
OK0667 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $670 $760 Not Implemented
OK0667 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,471 $1,855 Not Implemented
OK0667 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $931 $185 Not Implemented
OK0667 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $604 $643 Not Implemented
OK0667 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $551 $2,519 Not Implemented
OK0667 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $367 Not Implemented
OK0667 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $5,401 Not Implemented