IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0250 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,394 $1,000 Implemented
AS0250 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $720 $30 Not Implemented
AS0250 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,688 $12,256 Not Implemented
AS0250 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,967 $180 Not Implemented
AS0249 # 01 Y:1999 01 1999 INSTALL TIMERS AND/OR THERMOSTATS $351 $375 Not Implemented
AS0249 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,404 $120 Not Implemented
AS0249 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $2,625 Not Implemented
AS0249 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $213 $792 Implemented
AS0249 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,775 $90 Not Implemented
AS0249 # 06 Y:1999 06 1999 ADOPT IN-HOUSE MATERIAL GENERATION $6,187 $90 Implemented
AS0248 # 07 Y:1999 07 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $21,288 $90 Implemented
AS0248 # 08 Y:1999 08 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,223 $30 Implemented
AS0248 # 09 Y:1999 09 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,502 $2,900 Not Implemented
AS0248 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,789 $16,031 Not Implemented
AS0248 # 02 Y:1999 02 1999 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $358 $30 Implemented
AS0248 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,014 $3,338 Implemented
AS0248 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $12,875 $240 Not Implemented
AS0248 # 05 Y:1999 05 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,607 $4,200 Implemented
AS0248 # 06 Y:1999 06 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,334 $4,260 Implemented
AS0247 # 01 Y:1999 01 1999 INSTALL SKYLIGHTS $7,511 $13,983 Not Implemented
AS0247 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $20 Implemented
AS0247 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $587 $1,275 Implemented
AS0247 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $253 Implemented
AS0247 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,734 $4,593 Not Implemented
AS0247 # 06 Y:1999 06 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $18,060 $5,209 Not Implemented