IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0667 # 10 Y:2003 10 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,803 $500 Not Implemented
OK0667 # 11 Y:2003 11 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,265 $0 Not Implemented
OK0665 # 01 Y:2003 01 2003 INSTALL SET-BACK TIMERS $4,895 $664 Implemented
OK0665 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,602 $0 Not Implemented
OK0665 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,094 $6,844 Not Implemented
OK0665 # 04 Y:2003 04 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,748 $3,480 Implemented
OK0665 # 05 Y:2003 05 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $10,600 $0 Implemented
OK0665 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,398 $1,374 Not Implemented
OK0665 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,550 $13,880 Implemented
OK0665 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $1,048 Implemented
OK0665 # 09 Y:2003 09 2003 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,136 $32,000 n/a
OK0666 # 01 Y:2003 01 2003 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $15,468 $30,000 Not Implemented
OK0666 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $18,000 $0 Not Implemented
OK0666 # 03 Y:2003 03 2003 INSTALL SET-BACK TIMERS $11,925 $1,200 Not Implemented
OK0666 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $543 $404 Not Implemented
OK0666 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,253 $3,276 Not Implemented
OK0666 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,844 $100 Not Implemented
OK0666 # 07 Y:2003 07 2003 USE A DIFFERENT OR RECYCLED RAW MATERIAL $136,157 $28,500 Not Implemented
OK0666 # 08 Y:2003 08 2003 IMPROVE SPACE COMFORT CONDITIONING $58,240 $20,000 Not Implemented
OK0663 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $3,549 $3,270 Implemented
OK0663 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $5,487 Implemented
OK0663 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $501 $748 Implemented
OK0663 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $55,688 $83,636 Not Implemented
OK0663 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,384 $4,820 Not Implemented
OK0663 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,144 $568 Implemented