IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0263 # 10 Y:2004 10 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $1,100 Not Implemented
UM0263 # 11 Y:2004 11 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $261 $1,000 Not Implemented
GT0788 # 01 Y:2004 01 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $7,899 $0 Implemented
GT0788 # 02 Y:2004 02 2004 COMBINE UTILITY METERS $16,373 $0 Not Implemented
GT0788 # 03 Y:2004 03 2004 COVER OPEN TANKS $4,940 $3,185 Not Implemented
GT0788 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $13,315 $31,400 Not Implemented
GT0788 # 05 Y:2004 05 2004 AIR CONDITION ONLY SPACE NECESSARY $8,123 $3,450 Implemented
GT0788 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,890 $0 Implemented
GT0788 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $144 $1,100 Implemented
GT0788 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,396 $3,768 Implemented
GT0788 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $760 $1,200 Implemented
GT0788 # 10 Y:2004 10 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,462 $1,000 Not Implemented
SD0347 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $450 Implemented
SD0347 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,552 $0 Implemented
SD0347 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,721 $21,387 Not Implemented
SD0347 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,700 $18,500 Not Implemented
SD0347 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $128,000 $145,000 Not Implemented
MI0088 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,029 $0 Not Implemented
MI0088 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $28,772 $2,300 Implemented
MI0088 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-1,117 $750 Implemented
MI0088 # 04 Y:2004 04 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,760 $40,140 Implemented
MI0088 # 05 Y:2004 05 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $427,935 $0 Implemented
MI0088 # 06 Y:2004 06 2004 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $17,529 $0 Not Implemented
MI0088 # 07 Y:2004 07 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $14,310 $0 Not Implemented
MI0088 # 08 Y:2004 08 2004 PAY BILLS ON TIME TO AVOID LATE FEES $770 $0 Implemented