IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0710 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $560 $275 Not Implemented
GT0709 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,318 $500 Not Implemented
GT0709 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,200 $250 Not Implemented
GT0709 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,340 $1,150 Not Implemented
GT0709 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,241 $850 Not Implemented
GT0709 # 05 Y:2001 05 2001 USE POWER DURING OFF-PEAK PERIODS $30,130 $0 Not Implemented
GT0709 # 06 Y:2001 06 2001 IMPROVE SPACE COMFORT CONDITIONING $205,424 $21,200 Not Implemented
GT0709 # 07 Y:2001 07 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,125 $1,000 Not Implemented
GT0709 # 08 Y:2001 08 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,850 $2,000 Not Implemented
GT0709 # 09 Y:2001 09 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $360,000 $1,600,000 Not Implemented
GT0709 # 10 Y:2001 10 2001 METER WASTE WATER $8,955 $6,500 Not Implemented
GT0709 # 11 Y:2001 11 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,468 $29,375 Not Implemented
GT0707 # 01 Y:2001 01 2001 KEEP BOILER TUBES CLEAN $5,290 $3,000 Not Implemented
GT0707 # 02 Y:2001 02 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,057 $5,500 Not Implemented
GT0707 # 03 Y:2001 03 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,040 $6,700 Implemented
GT0707 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,680 $3,496 Not Implemented
GT0707 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $72 Implemented
GT0707 # 06 Y:2001 06 2001 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $7,808 $0 Implemented
GT0707 # 07 Y:2001 07 2001 MODIFY STARTUP/SHUTDOWN TIMES $45,820 $0 Implemented
GT0707 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $179 $250 Not Implemented
GT0706 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $400 $0 n/a
GT0706 # 02 Y:2000 02 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,875 $0 n/a
GT0706 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,695 $0 n/a
GT0706 # 04 Y:2000 04 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $28,255 $13,250 n/a
GT0706 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $3,360 n/a