IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0173 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $112,000 $49,860 Not Implemented
WI0356 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,392 $162,000 Not Implemented
WI0356 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,279 $58,100 Not Implemented
WI0356 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,328 $3,182 Not Implemented
WI0356 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,610 $3,150 Not Implemented
WI0356 # 05 Y:1999 05 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $223 $666 Not Implemented
WI0356 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,408 $640 Implemented
WI0356 # 07 Y:1999 07 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,364 $0 Not Implemented
WI0356 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,469 $500 Not Implemented
WI0356 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $3,856 Implemented
WI0356 # 10 Y:1999 10 1999 PAY BILLS ON TIME TO AVOID LATE FEES $105 $0 Implemented
DS0146 # 01 Y:1999 01 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,610 $5,010 Not Implemented
DS0146 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $440 $540 Implemented
DS0146 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $364 Not Implemented
DS0146 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,488 $856 Implemented
DS0146 # 05 Y:1999 05 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $16,231 $8,361 Not Implemented
DS0146 # 06 Y:1999 06 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,235 $2,407 Not Implemented
DS0146 # 07 Y:1999 07 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,185 $4,480 Not Implemented
DS0146 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,008 $240 Not Implemented
CO0444 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,280 $1,000 Implemented
CO0444 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $3,560 $450 Not Implemented
CO0444 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $0 Implemented
CO0444 # 04 Y:1999 04 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $19,000 $21,600 Not Implemented
CO0444 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $230 $0 Implemented
NC0168 # 01 Y:1999 01 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,533 $10,000 Not Implemented