IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0253 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $169,857 $39,760 Implemented
LL0253 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $120,278 $11,880 Not Implemented
LL0253 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $67,882 $10,319 Not Implemented
LL0253 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,598 $8,750 Not Implemented
TA0116 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,371 $16,650 Not Implemented
TA0116 # 02 Y:2006 02 2006 CONTRACT A WOOD PALLET RECYCLING COMPANY $13,000 $0 Not Implemented
TA0116 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $240 Not Implemented
TA0116 # 04 Y:2006 04 2006 INSTALL SYSTEM TO COLLECT SCRAP $21,734 $1,600 Not Implemented
TA0116 # 05 Y:2006 05 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,820 $0 Not Implemented
MA0604 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $33,327 $2,600 Not Implemented
MA0604 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,912 $14,335 Implemented
MA0604 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,796 $67,450 Not Implemented
MA0604 # 04 Y:2006 04 2006 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $8,539 $8,050 Implemented
MA0604 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,518 $12,500 Not Implemented
MA0604 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $3,250 $8,000 Not Implemented
MA0604 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $13,536 Implemented
IA0388 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $4,918 Implemented
IA0388 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,183 $6,385 Implemented
IA0388 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $2,587 $3,234 Implemented
IA0388 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,069 $1,000 Implemented
IA0388 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,869 $480 Implemented
IA0388 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,922 $52 Implemented
IA0388 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,279 $1,972 Not Implemented
IA0388 # 08 Y:2006 08 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $47,693 $45,600 Implemented
LE0236 # 01 Y:2006 01 2006 REDESIGN PROCESS $328,340 $1,000,000 Not Implemented