IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0489 # 02 Y:2005 02 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,360 $0 Implemented
WI0489 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,677 $758 Implemented
WI0489 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,606 $3,000 Not Implemented
WI0489 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,494 $2,314 Implemented
WI0489 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $782 $0 Implemented
WI0489 # 07 Y:2005 07 2005 IMPROVE LUBRICATION PRACTICES $735 $828 Not Implemented
WI0489 # 08 Y:2005 08 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $815 $0 Implemented
WI0489 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $481 $100 Implemented
WI0489 # 10 Y:2005 10 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $206 $0 Implemented
WI0487 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,912 $11,200 Implemented
WI0487 # 02 Y:2005 02 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $933 $0 Implemented
WI0487 # 03 Y:2005 03 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,262 $5,600 Implemented
WI0487 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,836 $780 Implemented
WI0487 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $714 $1,280 Implemented
WI0487 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $334 $400 Implemented
WI0487 # 07 Y:2005 07 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,350 $1,200 Implemented
WI0487 # 08 Y:2005 08 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,185 $1,400 Not Implemented
WI0487 # 09 Y:2005 09 2005 PAY BILLS ON TIME TO AVOID LATE FEES $1,172 $0 Implemented
WI0487 # 10 Y:2005 10 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,165 $3,000 Not Implemented
WI0487 # 11 Y:2005 11 2005 COVER OPEN TANKS $1,108 $360 Not Implemented
WI0486 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $20,351 $18,000 Not Implemented
WI0486 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,915 $1,280 Implemented
WI0486 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,600 $7,840 Not Implemented
WI0486 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $0 Implemented
WI0486 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,086 $780 Implemented