IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0247 # 07 Y:2000 07 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $720 $0 Implemented
OK0600 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $762 $533 Not Implemented
OK0600 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $288 $72 Implemented
OK0600 # 03 Y:2000 03 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,243 $15,100 Not Implemented
OK0600 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $2,637 Not Implemented
OK0600 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $2,548 $0 Implemented
OK0600 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $120,510 $250,000 Not Implemented
NC0193 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $3,710 Not Implemented
NC0193 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $3,831 $3,617 Implemented
NC0193 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,422 $56 Not Implemented
NC0193 # 04 Y:2000 04 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,211 $3,850 Not Implemented
NC0193 # 05 Y:2000 05 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,491 $500 Not Implemented
NC0193 # 06 Y:2000 06 2000 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $64,272 $64,142 Not Implemented
NC0193 # 07 Y:2000 07 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $23,000 $1,000 Not Implemented
UD0602 # 01 Y:2000 01 2000 DEVELOP STANDARD OPERATING PROCEDURES $643,500 $150,000 Implemented
UD0602 # 02 Y:2000 02 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $91,844 $0 Not Implemented
UD0602 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,455 $31,020 Not Implemented
UD0602 # 04 Y:2000 04 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,807 $7,600 Not Implemented
AM0377 # 01 Y:2000 01 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,190 $0 Implemented
AM0377 # 02 Y:2000 02 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,500 $6,100 Implemented
AM0377 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,870 $500 Implemented
AM0377 # 04 Y:2000 04 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $900 $1,000 Not Implemented
AM0377 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $450 $110 Implemented
AM0377 # 06 Y:2000 06 2000 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $320 $0 Implemented
AM0377 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $230 $0 Implemented