IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2220 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $448 $270 Implemented
LS2220 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,145 $750 Not Implemented
LS2220 # 04 Y:2022 04 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $24,642 $68,828 Not Implemented
LS2219 # 01 Y:2022 01 2022 INSTALL SENSORS TO DETECT AND AVOID JAMS $35,000 $7,400 Not Implemented
LS2219 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $679 $150 Not Implemented
LS2219 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $389 $225 Implemented
LS2219 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $676 $1,121 Implemented
LS2219 # 05 Y:2022 05 2022 USE PHOTOCELL CONTROLS $281 $740 Not Implemented
OK1073 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $32,771 $39,489 Not Implemented
OK1073 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,548 $12,334 Not Implemented
OK1073 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,161 $9,927 Implemented
OK1073 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,707 $1,176 Implemented
OK1073 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,129 $0 Implemented
CM1002 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,003 $44,000 Implemented
CM1002 # 02 Y:2022 02 2022 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,800 $100,000 Not Implemented
CM1002 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $410 $4,100 Not Implemented
CM1002 # 04 Y:2022 04 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $4,300 $3,000 Not Implemented
CM1002 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $21,000 $740,000 Implemented
CM1002 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $32,600 $850,000 Not Implemented
CM1002 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $220 $860 Not Implemented
CM1002 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $1,200 Not Implemented
MS0398 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,227 $6,769 Implemented
MS0398 # 02 Y:2022 02 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,148 $536 Not Implemented
MS0398 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,341 $3,593 Not Implemented
UD1041 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,355 $0 Not Implemented