Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0160 # 07 Y:2000 | 07 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,708 | $2,195 | Not Implemented |
MS0160 # 08 Y:2000 | 08 | 2000 | COMBINE UTILITY METERS | $3,023 | $1,000 | Not Implemented |
MS0160 # 09 Y:2000 | 09 | 2000 | BURN WASTE OIL FOR HEAT | $1,949 | $2,067 | Not Implemented |
GT0661 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $20,275 | $4,960 | Not Implemented |
GT0661 # 02 Y:1999 | 02 | 1999 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,938 | $300 | Implemented |
GT0661 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,740 | $750 | Not Implemented |
GT0661 # 04 Y:1999 | 04 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $457 | $994 | Not Implemented |
GT0661 # 05 Y:1999 | 05 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $684 | $1,000 | Not Implemented |
GT0661 # 06 Y:1999 | 06 | 1999 | REDUCE SCRAP PRODUCTION | $215,560 | $112,500 | Implemented |
GT0661 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $673,610 | $245,000 | Implemented |
MS0129 # 01 Y:1999 | 01 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,582 | $0 | Not Implemented |
MS0129 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,133 | $479 | Not Implemented |
MS0129 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,721 | $29,711 | Not Implemented |
MS0129 # 04 Y:1999 | 04 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,500 | $3,600 | Not Implemented |
MS0129 # 05 Y:1999 | 05 | 1999 | BURN WASTE OIL FOR HEAT | $623 | $1,804 | Not Implemented |
MS0129 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,555 | $250 | Implemented |
MS0129 # 07 Y:1999 | 07 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $6,831 | $7,225 | Not Implemented |
MS0128 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $441 | $94 | Implemented |
MS0128 # 02 Y:1999 | 02 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,291 | $149 | Implemented |
MS0128 # 03 Y:1999 | 03 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $905 | $472 | Implemented |
MS0128 # 04 Y:1999 | 04 | 1999 | USE RE-USABLE FILTERS | $143 | $160 | Implemented |
MS0119 # 01 Y:1998 | 01 | 1998 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $24,225 | $7,315 | Not Implemented |
MS0119 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,424 | $21,311 | Not Implemented |
MS0119 # 03 Y:1998 | 03 | 1998 | USE SYNTHETIC LUBRICANT | $1,266 | $440 | Implemented |
MS0119 # 04 Y:1998 | 04 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $32,240 | $31,500 | Implemented |