Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0239 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,088 | $3,600 | Not Implemented |
AS0239 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,473 | $23,248 | Not Implemented |
AS0239 # 04 Y:1998 | 04 | 1998 | USE OPTIMUM THICKNESS INSULATION | $11,065 | $3,346 | Not Implemented |
AS0239 # 05 Y:1998 | 05 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $141,705 | $103,000 | Not Implemented |
AS0239 # 06 Y:1998 | 06 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $7,760 | $120 | Not Implemented |
AS0239 # 07 Y:1998 | 07 | 1998 | MINIMIZE WATER USAGE | $18,668 | $82,192 | Not Implemented |
AS0239 # 08 Y:1998 | 08 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $72,397 | $325,070 | Not Implemented |
AS0238 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $901 | $1,875 | Not Implemented |
AS0238 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,256 | $16,930 | Not Implemented |
AS0238 # 03 Y:1998 | 03 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,014 | $60 | Not Implemented |
AS0238 # 04 Y:1998 | 04 | 1998 | APPLY FOR INVESTMENT INCENTIVES | $1,436 | $60 | Not Implemented |
AS0236 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,320 | $12,169 | Not Implemented |
AS0236 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $563 | $425 | Not Implemented |
AS0236 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $391 | $60 | Not Implemented |
AS0236 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,972 | $20 | Not Implemented |
AS0236 # 05 Y:1998 | 05 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,954 | $3,800 | Not Implemented |
AS0236 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $266 | $60 | Not Implemented |
AS0236 # 07 Y:1998 | 07 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,433 | $9,200 | Not Implemented |
AS0236 # 08 Y:1998 | 08 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $3,018 | $1,725 | Not Implemented |
AS0236 # 09 Y:1998 | 09 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $120 | $60 | Not Implemented |
AS0236 # 10 Y:1998 | 10 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $6,934 | $1,560 | Not Implemented |
AS0236 # 11 Y:1998 | 11 | 1998 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $46,400 | $2,180 | Not Implemented |
AS0236 # 12 Y:1998 | 12 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $1,487,526 | $600,000 | Not Implemented |
AS0237 # 01 Y:1998 | 01 | 1998 | INSTALL OCCUPANCY SENSORS | $791 | $2,613 | Not Implemented |
AS0237 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,106 | $60 | Not Implemented |